Skip to main content

Search

Trago Mills - Nuaire Case Study

Case Study

Trago Mills

Wales' largest retail development, opened its doors in 2018

Trago Mills - Ariel view

Ariel View

The project

Over 30 years in the planning and boasting over 80,000 products, the Trago Mills superstore in Merthyr Tydfil, South Wales has over 350 staff members and 200,000m² of retail space. The huge retail development stretches ½ mile long end-to-end.

The challenge

Navigating a store as large as Trago Mills can often take hours and the comfort of visitors was a key driver in the design of the store. The ventilation strategy would need to provide adequate fresh air to potentially a few thousand customers, whilst also offering good levels of heat recovery to ensure a consistent temperature.

Alongside the large retail spaces, the site also consists of various offices and administrative areas. Ventilation in these areas needed to ensure the same level of comfort and efficiency as the rest of the store; however, space was a premium.

Trago Mills - Shopping Aisles

Shopping Aisles

The solution

Seven Boxer Bespoke AHU's were supplied, spread across the three buildings. Due to their size, five of these AHUs were used in the main retail area alone, all complete with thermal wheel heat exchangers. The inclusion of thermal wheels allowed the site to benefit from considerable levels of heat recovery, whilst making the best use of vertical spaces. For office areas, XBC units were supplied to provide similarly high levels of heat recovery with the limited void space available. The inclusion of Nuaire systems to Wales’ biggest retail space has ensured high levels of indoor air quality and maximum occupancy well-being and comfort.

Unit Applications:

  • Bespoke AHU - retail spaces, model railway area, soft play area, kitchen supply
  • XBC – office spaces
  • Squif – kitchen extract
  • DAVE – dishwash canopy
  • Airmover - large dishwash canopy
  • XS – cleaners storage
Trago Mills

Trago Mills - Outside

Trago Mills - AHU

Bespoke Solutions

Seven Bespoke AHUs were supplied, spread across the three buildings.

“ We needed to design a ventilation strategy to provide adequate fresh air for the occupants, along with good levels of heat recovery.”

                                                                                                               Peter Powell, McCann & Partners

Download Case Study

Trago Mills - PDF Case Study

Trago Mills - PDF Case Study

Downloads

Related Products

Contact Us
If you would like to know more about this case study please get in touch with us.
Read More